Contract Payment requirements will require 1/3 at the signing of a contract, 1/3 upon delivery and start of work, and 1/3 (less
$100.00 per inspection required) upon completion. The completion payment will be divided into 3 checks 1. to the plumber
1. to the electrician and 1 for the balance due to The Water Closet.
Projects that require 1 day or less for the installation will have a 50% deposit and the balance of 50% upon completion.
Owners have the right to cancel any installation contract within (3) business days from the signing for a full refund. All first
payment deposits will be by check, or cash. Credit cards can be used for second and final payments to The Water Closet .
Retail sales require 50% deposit and balance upon pick up. Delivery charges start at $75.00
All Deposits are by check, money order or cash only. All other Payments can be accepted by credit card. All credit card
transactions must be swiped in our store.
Design fees are due in full upon request.
If permits are required a final payment will be allocated according to State Law 13:45A-16.2 @ $100.00 per inspection .
Owners must be present for the final building department inspections. Failure to close the permit within 30 Days of the
completion will result in a 3% interest charge on any outstanding contract balances, and owners will be responsible for any
fines or additional cost the state or local building departments may assess.
Allowances, Credits and Change Orders
Amounts included in the contract for the Plumber and Electrician is a cost estimate only. At your request The Water Closet
acting as the owners’ agent will schedule the mechanics and inspectors needed. A bill from each mechanic will be provided
and payments for their bill will be made directly to them for their work. The Amounts listed as allowances for electric or
plumbing in the contract will be credited to the owners invoice when the appropriate payment is due. Any other changes to
the contract may result in an extra cost or credit to the next scheduled payment. If any additional work requested requiring
items not available (special order) will result in a separate work order and a return visit to be scheduled.
Installation Terms and Agreement
All materials are guaranteed to be as manufacturers specified as new. Any display or reconditioned items or items supplied
by owners will not be warranted unless written in the contract. All product installations will be as specified. All installation
work will be performed in consecutive work days. Access and cooperation of the owner must include continuous access to
the project during the working hours of 8:00a.m. - 4:30 pm. Monday through Friday on the dates scheduled for your
installation. If repair or service is requested under the terms of our written warranty, they must also be scheduled during our
normal working hours.
Owners must provide work area and storage for all the materials on premises during installation dates provided.
Owners have design options available during the construction phase. If owners cannot be present during the installation then
"Contractors Design" is the accepted and cannot be altered after the items are installed. A written change order is required
with the cost for any changes.
All Homes are not perfectly level or plumb, our contract doesn't include any restructuring of the existing room unless it is
requested and written in detail with the cost prior to signing of a contract. If your home is out of level, square or plumb prior
to us updating the fixtures or any contract items, it will remain the same when we finish.
Any unforeseen additional work, alteration or deviation from the specifications, or unexpected modifications (during
construction) to the existing sub-floor or open walls necessary, will result in an extra cost or credit to be applied to the next
scheduled payment.
A Binding Agreement that any Controversy or Claim rising out of or relating to this contract, or breach of this contract shall be
settled by arbitration in accordance with the rules of a Court of Law. A judgement of a court having jurisdiction may be
entered upon the arbitrators’ award within the boundaries set forth in the limited warranty.
All agreements are contingent upon delays beyond our control. Any delays caused by the Owner , including items added or
changes requested to the contract that require a return trip will be an extra trip charge. Any request to change the contracted
install date must be done 9 days prior to avoid any rescheduling fees. Any delay to the working hour agreement in this
contract caused by the buyer during the install procedure, will result in an extra charge according to our daily hourly cost.
Owners of property must carry Fire, Tornado, and a standard home-owner insurance policy. Owners are responsible for the
safety of all items stored during construction. Our workers are fully covered by Workman's Compensation insurance. At your
request a copy of the lien holder certificate can be supplied for all the insurance policies we have in place concerning your
project and purchase.
No Painting or Wallpaper in any areas of the home including nail pops or damage that may occur in the adjacent rooms. We
will sand any repairs smooth and owners will be responsible for painting. All new wood trim will have nails set (recessed)
only.
Our remodeling approach is guaranteed to make your bathroom renovation more enjoyable for you and your family.
We Design, Supply and Install